[threecol_two]Now that the power train was put back together and the Scout neared completion, it was time to start working on the auxiliary things. First one, on-board air. At first we figured that we’d use an ARB compressor with the ARB lockers in the axles, but as plans grew, we decided that if we wanted to have a usable air source, then we’d have to go with a higher volume compressor.
If there is one thing on most ‘wish lists’ its on-board air. The kind you can fill tires with, or use air tools. However, its usually pretty difficult to find room for such a compressor. But, with many preceding us, the use of an old AC compressor has quickly become the ‘compressor of choice’ among the majority of Wheelers. The idea is simple, take the AC compressor (usually a York) and attach an air filter on the ‘inlet’ side, and air lines to the output side. Instead of refrigerant, it compresses air, and lots of it.
P3’s air source was easy to figure out, so we turned our attention to storage and ‘delivery’. Storage was easy. Put a tank in. Our goal was to fill the open space under the bed (between the axle and t-case, just behind the seats) with as big as air tank as we could. After a bit of measuring, it was clear that an 8.5″ diameter tank would do perfectly. Unfortunately, our desires for major storage were not satisfied with your standard off-the-shelf air tank. Sure they were useful, but they were also pretty small (4-6″ in diameter).
So we built our own tank. Using 8″ thick wall pipe and a couple end caps. If you’re seeing caution flags, don’t worry, we’ve seen professional pipe workers use this stuff with tons of pressure, since we’re only going with 120 PSI system (which is common for off-road, and the upper limit an ARB can hold), the tank will hold up just fine.
Weld-in ‘bungs’ are were used to create threaded inlets (one for feed and one for a drain) in the tank (our goal was the less we have to weld, the less chances of leaks!) and custom bracketry will allow us to bolt the tank into place.
We then were able to start connecting the rest of the system.
Our first objective was to put an air outlet on every side of P3 (front, back, left and right). Front and back are easy, just put some quick connects in. Our dilemma was with the sides. Sure we can put them behind the Rock Sliders (yet to be installed) but then you’d have to go under P3 for the air, which can be a little difficult on extreme terrain. So the plan was to mount the side quick-connects to the cage, pointing outward.
Obliviously we needed some hardware. After a quick look through the McMaster-Carr catalog, we had our stuff in hand and we were ready to knock it out. As you can see there, we ordered up some thick-wall metal tube, steel braided flexible tube (for tricky connections) and various other things.
First this to do was to hook up and run the rigid lines. This took a ton of patience since we didn’t want to have any trouble with leaks. But after all was said and done, it was relatively simple. 90 degree elbows, t-fittings and a couple 4-way couplings were used throughout P3, most of which is kept snug to the body, well protected from possible encounters with the tera-firma.
The rigid lines were connected to the AC compressor by one of the long flexible hoses, this allows the needed give when the engine rocks slightly in the engine bay. All other junctions are rigid, and held nicely in place. The only other places where flexible line was use, was the quick disconnects in the cab.
The pressure switch was placed in line with everything else, so that when the air system is needed, it’ll automatically cycle the compressor on and off (at 80 PSI and 120 PSI respectively). In event of a compressor failure, and to insure that the air system doesn’t blow up if overcharged, a pressure relief valve was placed in the system. This valves acts like a circuit breaker, if the pressure in the system goes over its maximum, the valve automatically opens (which releases the excess pressure) and then shuts again when the pressure drops to a safe level.
The last step in this whole process is in testing. So, with stopwatch in hand, we timed how long it took the AC compressor to fill the lines and storage tank to zero to 120 psi. Answer, 90 seconds. Then we checked for leaks, none we could notice right off. After that, with the air system off, we flattened P3’s tires and checked how many tires the system could fill on one charge. Answer two (and those are 37×12.50 Super Swampers on 15×10″ rims). Last of all we charged the system, filled the remaining tires and then shut everything down for a leak down test. To our surprise, after a full weekend, the pressure in the system only dropped 5 PSI, and a total of 10 PSI over the course of a week.
With that, we labeled it ‘finished’ and move on to the next task.
[/threecol_two] [threecol_one_last]
[/threecol_one_last]
[hr]
[threecol_one]

[/threecol_one] [threecol_one]

[/threecol_one] [threecol_one_last]

[/threecol_one_last]
[hr]
[threecol_one]

[/threecol_one] [threecol_one]

[/threecol_one] [threecol_one_last]

[/threecol_one_last]
[hr]
[threecol_one]

[/threecol_one] [threecol_one]

[/threecol_one] [threecol_one_last]

[/threecol_one_last]
[hr]
[threecol_one]

[/threecol_one] [threecol_one]

[/threecol_one] [threecol_one_last]

[/threecol_one_last]
[hr]
[threecol_one]

[/threecol_one] [threecol_one]

[/threecol_one] [threecol_one_last]

[/threecol_one_last]
[hr]
[threecol_one]

[/threecol_one] [threecol_one]

[/threecol_one] [threecol_one_last]

[/threecol_one_last]
[hr]
[twocol_one]

[/twocol_one] [twocol_one_last]

[/twocol_one_last]












